For companies that need extra space, the same question often arises: how fast can a Flexhal actually be built? In many situations, time is a critical factor. Production must continue, storage space must be expanded, or a temporary solution must be realized quickly.
A Flexhal has been specifically developed to create extra business space quickly in these types of situations.
The construction of a Flexhal is surprisingly fast
Where traditional new construction can often take months, a Flexhal can be realized in a relatively short period. The construction consists of a modular system where the components are efficiently assembled on-site.
Additionally, a Flexhal usually does not require extensive groundworks. In many cases, the hall can be placed on a relatively simple foundation, which means preparation and construction proceed faster than with traditional building methods.
As a result, the construction process is clear and fast. As soon as the preparation, such as groundworks and site readiness, is completed, the installation of the structure can begin.
The actual placement of a Flexhal in many cases takes only 3 weeks. What do those three weeks look like?
Week 1: construction
The main load-bearing structure of the hall is placed.
Week 2: cladding
The walls and the roof are installed.
Week 3: finishing
The hall is further finished and prepared for use.
Because the system is modular, the structure can be installed efficiently and quickly.
Most of the work is in the preparation
Although the construction itself is fast, part of the lead time is often in the preparation. Consider, for example:
-
determining the right surface for your Flexhal
-
any modifications to the location
-
permits or internal preparations
At Flexhal, much attention is paid to this in the work preparation. We actively contribute ideas regarding the necessary groundworks and the best way to realize the hall at the location.
Additionally, we work with our own structural engineers who can quickly calculate the construction according to the building regulations. This allows technical issues and permit applications to be addressed quickly.
There are also short lines of communication with installers when, for example, electricity, lighting, or climate control is required. This allows the entire process to be coordinated efficiently.
Permits also often proceed quickly
In addition to the fast construction time, the permit process for a Flexhal often proceeds faster than for traditional new construction. Because it involves a relatively light and modular structure, the procedure can be completed smoothly in many cases.
This often allows for quick clarity regarding the possibilities.
From order to placement in approximately 3 months
Once the preparation and permit are clear, the process can proceed quickly. In many cases, a Flexhal can already be realized within approximately 3 months after the order.
The combination of fast preparation, limited groundworks, and efficient installation makes this possible.
A Flexhal as a fast solution for extra business space
Precisely because the installation is relatively fast, a Flexhal is often chosen by companies that need extra space quickly. Consider applications such as:
-
extra storage space
-
temporary production capacity
-
expansion of logistics space
-
bridging during renovation or new construction
The combination of a sturdy construction and fast realization makes a Flexhal a practical solution for many companies.
Quick clarity on the possibilities
How quickly a Flexhal can actually be realized always depends on the situation. Dimensions, location, and use all play a role.
By briefly discussing the situation, insight into the feasibility and the expected planning of the project is often quickly gained.